Nippon Chikudenchi Starts Power Reception at 'NC Kuchiharu Battery Station' in Fukuoka

Nippon Chikudenchi and Remixpoint have started power reception at the 'NC Kuchiharu Battery Station' in Kama City, Fukuoka Prefecture.
businessNQ 48/100出典:PR Times

📋 Article Processing Timeline

  • 📰 Published: June 1, 2026 at 15:00
  • 🔍 Collected: June 1, 2026 at 15:27 (27 min after Published)
  • 🤖 AI Analyzed: June 1, 2026 at 15:28 (0 min after Collected)
Nippon Chikudenchi Co., Ltd. announced that it has started power reception at the 'NC Kuchiharu Battery Station' (Kama City, Fukuoka Prefecture), which is being developed jointly with Remixpoint, Inc. The facility uses a battery system from CATL and power conditioners from TMEIC, aiming for stable operation in the supply-demand adjustment market and JEPX. Construction was handled by Kraftia Co., Ltd., with designs that consider local environmental conservation. It is expected to serve as critical infrastructure for smoothing renewable energy output.

FAQ

What are the benefits of grid-scale batteries?

They enable stabilization of the power grid and effective use of renewable energy.