MAT Co., Ltd. (Headquarters: Midori-ku, Nagoya, Representatives: Takayoshi Yoshikawa / Yoichi Kondo), a specialized manufacturer of landscape concrete paving materials, implemented a floor renovation of a pedestrian bridge using its flagship product 'Mat Spray' in a pedestrian bridge repair work carried out in Nagoya City.

This construction was handled by Suehiro Co., Ltd., a certified installer of MAT Co., Ltd., achieving high quality and a short construction period. The aging floor surface of the pedestrian bridge has been beautifully regenerated by construction with specialized technology, receiving high praise from users who say it has become 'incredibly beautiful.'

**■ Construction Overview** - Construction Location: Chukyo University Yamatedori 2nd Pedestrian Bridge (Yamatedori, Showa-ku) - Construction Type: Public Works - Construction Area: Pedestrian bridge floor surface - Construction Area Size: 32 square meters - Construction Period: March 2026 - Construction Method: Formwork spray paving method

**■ Background and Challenges of Construction** Many years have passed since the pedestrian bridge in Nagoya City was installed, and the wear, fading, and cracking of the floor surface were progressing. In addition to ensuring the safety of pedestrians, there was a demand for the improvement of the road landscape, requiring a renovation that also considered the aesthetic design in harmony with the environment located in an urban landscape formation district. Furthermore, due to the characteristics of a pedestrian bridge as public infrastructure, there was a need to carry out the construction while suppressing the impact on traffic...

FACT BOX

  • Source: PR TIMES
  • Category: News