ILC Corporation to Release 'INTAconnection Ver.1.43', a DX-ready Embedded Control Development Environment, at the End of June

Key facts

  • ILC Corporation to Release 'INTAconnection Ver.1.43', a DX-ready Embedded Control Development Environment, at the End of June
  • ILC Corporation will release 'INTAconnection Ver.1.43', an embedded control development environment, at the end of June 2026. This update enhances connectivity with Omron and Keyence PLCs, expands OPC UA support, and adds scripting functionality, improving on-site data utilization and development efficiency.
  • Source: PR Times
  • Date: June 2, 2026

Direct answer

ILC Corporation will release 'INTAconnection Ver.1.43', an embedded control development environment, at the end of June 2026. This update enhances connectivity with Omron and Keyence PLCs, expands OPC UA support, and adds scripting functionality, improving on-site data utilization and development efficiency.

Citation
ILC Corporation to Release 'INTAconnection Ver.1.43', a DX-ready Embedded Control Development Environment, at the End of June (June 2, 2026), PR Times
Source
PR Times
Date
June 2, 2026
ILC Corporation will release 'INTAconnection Ver.1.43', an embedded control development environment, at the end of June 2026. This update enhances connectivity with Omron and Keyence PLCs, expands OPC UA support, and adds scripting functionality, improving on-site data utilization and development efficiency.
新製品NQ 89/100出典:PR Times

📋 Article Processing Timeline

  • 📰 Published: June 2, 2026 at 19:10
  • 🔍 Collected: June 2, 2026 at 10:20
  • 🤖 AI Analyzed: June 2, 2026 at 19:33 (9h 13m after Collected)
ILC Corporation (Headquarters: Marunouchi, Chiyoda-ku, Tokyo; Representative Director and CEO: Hideya Onishi) is scheduled to release 'INTAconnection Ver.1.43', the latest version of its DX-ready embedded control development environment, at the end of June 2026.

INTAconnection is an embedded control development environment that allows users to create control programs visually tailored to specific needs by combining functions as software modules called 'FunctionBox.' It supports integration with PLCs, industrial equipment, and host systems, contributing to data utilization and smart factory transformation.

Ver.1.43 strengthens connectivity with common PLCs and OPC UA servers, while adding features for bulk processing of multi-point data and simplifying complex control logic, enabling more efficient collection and control of facility data.

Key Features of INTAconnection Ver.1.43:

1. Expanded connectivity with existing equipment and more flexible PLC integration
Adds FunctionBox modules for communication with Omron and Keyence PLCs. This enables read/write access to device data in existing equipment, allowing for flexible control flow construction in environments where PLCs from different manufacturers are mixed.

2. Streamlined multi-point data integration via OPC UA and SLMP
Expands OPC UA FunctionBox capabilities to fetch data from OPC UA servers for use in INTAconnection control processes. It also updates SLMP FunctionBox to enable bulk reading/writing of multiple data points between Connected PLC internal memory and Mitsubishi Electric MELSEC sequencer device memory. This supports the efficient construction of monitoring and control systems handling hundreds of data points.

3. Simplified control flows and improved development/maintenance efficiency
Adds a script-writing FunctionBox, allowing users to write custom scripts within INTAconnection. It also adds a FunctionBox for detecting rising/falling edges of input data, enabling intuitive construction of processes triggered by sensor or PLC signal changes. Furthermore, improvements to program writing methods and command execution times for Connected PLC facilitate smoother prototyping, verification, and adjustment.

FAQ

What new features does ILC Corporation's INTAconnection Ver.1.43 include for Omron PLC integration?

INTAconnection Ver.1.43 enhances connectivity with Omron PLCs, improving on-site data utilization and development efficiency.

When will ILC Corporation officially release INTAconnection Ver.1.43?

ILC Corporation will release INTA游戏副本ection Ver.1.43 at the end of June 2026.

How does INTAconnection Ver.1.43 improve support for Keyence PLCs?

INTAconnection Ver.1.43 enhances connectivity with Keyence PLCs to improve data exchange and development efficiency.

What version of OPC UA support is expanded in INTAconnection Ver.1.43?

INTAconnection Ver.1.43 expands OPC UA support to improve on-site data utilization in embedded control environments.

What scripting functionality is added in ILC Corporation's INTAconnection Ver.1.43.43?

INTAconnection Ver.1.43 adds scripting functionality to enhance development efficiency and automation in embedded control systems.