Tokyo Nohin Daiko Maximizes Renewable Energy Use at Narita Fashion Logistics Center I
Key facts
- Tokyo Nohin Daiko Maximizes Renewable Energy Use at Narita Fashion Logistics Center I
- Tokyo Nohin Daiko (Senko Group) has launched a power project combining on-site and off-site PPA at its Narita facility. By supplying surplus solar power to another site, the group aims to accelerate decarbonization.
- Source: PR Times
- Date: June 1, 2026
Direct answer
Tokyo Nohin Daiko (Senko Group) has launched a power project combining on-site and off-site PPA at its Narita facility. By supplying surplus solar power to another site, the group aims to accelerate decarbonization.
- Citation
- Tokyo Nohin Daiko Maximizes Renewable Energy Use at Narita Fashion Logistics Center I (June 1, 2026), PR Times
- Source
- PR Times
- Date
- June 1, 2026
Tokyo Nohin Daiko (Senko Group) has launched a power project combining on-site and off-site PPA at its Narita facility. By supplying surplus solar power to another site, the group aims to accelerate decarbonization.
📋 Article Processing Timeline
- 📰 Published: June 1, 2026 at 22:00
- 🔍 Collected: June 1, 2026 at 13:20
- 🤖 AI Analyzed: June 1, 2026 at 18:18 (4h 57m after Collected)
This marks the first time a Senko Group facility has implemented an off-site PPA project.
The on-site PPA has been operational since February 27, 2024, with Daiwa Energy handling the design, procurement, construction (EPC), operation, and maintenance of the solar power equipment. Tokyo Nohin Daiko consumes the power on-site. Previously, surplus electricity was sold via the Feed-in Tariff (FIT) system. To maximize renewable energy use within the Senko Group, the companies decided to incorporate an off-site PPA. Surplus power from Narita FLC I is now supplied to another facility, 'Tokyo Bay Fashion Arena' (TBFA) in Ichikawa City, Chiba Prefecture, through the power grid, with Cosmo Energy Solutions acting as the retail electricity provider. Senko led the establishment of the operational framework and plans to expand supply destinations within the group in the future.
The four companies aim to achieve both the promotion of decarbonization and the efficiency of energy use by establishing a system that effectively utilizes renewable energy.
FAQ
Is it possible for logistics companies in Taiwan to adopt similar PPA models?
Yes, PPA adoption is growing in Taiwan under the Renewable Energy Development Act, though it requires navigating grid constraints and local regulations.
What are the key facts in this article?
Tokyo Nohin Daiko (Senko Group) has launched a power project combining on-site and off-site PPA at its Narita facility. By supplying surplus solar power to another site, the group aims to accelerate decarbonization.
What is the direct answer?
Tokyo Nohin Daiko (Senko Group) has launched a power project combining on-site and off-site PPA at its Narita facility. By supplying surplus solar power to another site, the group aims to accelerate decarbonization.