EV Construction Completes Installation of EV Fast Charger at Nagasaki Jidosha's Cocowalk Bus Center

EV Construction, a subsidiary of Terra Charge, has completed the installation of a 50kW EV fast charger at Nagasaki Jidosha's Cocowalk Bus Center, supporting the electrification of public transport in line with the 2030 goal of 10,000 EV buses.
その他NQ 42/100出典:PR Times

📋 Article Processing Timeline

  • 📰 Published: April 27, 2026 at 20:00
  • 🔍 Collected: April 27, 2026 at 11:31
  • 🤖 AI Analyzed: April 28, 2026 at 00:08 (12h 36m after Collected)
EV Construction Co., Ltd. (Headquarters: Minato-ku, Tokyo; CEO: Kosuke Nakagawa; hereinafter "the Company"), a subsidiary responsible for the installation and construction of EV chargers for Terra Charge Co., Ltd., a member of the Japan Bus Association, has completed the installation of a 50kW EV fast charger at the Cocowalk Bus Center of Nagasaki Jidosha Co., Ltd. (Headquarters: Nagasaki City, Nagasaki Prefecture; President: Makoto Morita; hereinafter "Nagasaki Jidosha").

■ Background
Toward achieving carbon neutrality by 2050, the Japan Bus Association has set a goal of introducing 10,000 EV buses by 2030, and bus companies are accelerating their shift to EVs. Major bus operators in Japan are considering or implementing EV buses in various forms. The Company is also strengthening its proposals for EV infrastructure through on-site surveys at bus depots.

The Company's services utilize a wealth of experience in charging infrastructure installation and operation to propose installations optimized for subsidy utilization, ensuring that no resources are wasted and costs are minimized. We will continue to carry out charger installation work so that the safe and secure transportation provided by bus operators can be stably operated even after the introduction of EVs.

■ Installation Details
Location: Cocowalk Bus Center (1-55 Morimachi, Nagasaki City)
Charger Specifications: One 50kW fast charger (1-port type)
Operation Start Date: April 24, 2026

■ Optimal Charger Proposals
Rather than pushing a specific charger, the Company pursues what is most rational for the client's vehicle model, depot conditions, and operational plans. We select and propose the best combination of chargers, installation work, and Energy Management Systems (EMS). Furthermore, leveraging a rich supply network for electrical equipment, we provide optimal proposals for various power facilities including cubicles (Top Runner 3), storage batteries, and solar power.

■ Future Outlook
The Company will continue to focus on developing depot charging infrastructure that supports the electrification of public transportation. Particularly at operational hubs like bus depots, we will provide a powerful backup for transport operators to achieve carbon neutrality by offering the optimal charging environment matched to vehicle operation schedules. We will continue to strengthen collaboration with local businesses and partner companies to work toward infrastructure optimization and value creation for a sustainable mobility society.

■ EV Construction Company Profile
Mission: "Energy for all people and EVs."
Headquarters: 5F Oak Takanawa Bldg., 2-17-11 Takanawa, Minato-ku, Tokyo
Representative: CEO Kosuke Nakagawa
Established: April 2023
URL: https://ev-construction.com/