NTT Urban Development Co., Ltd. Mitsubishi Jisho Residence Co., Ltd.

NTT Urban Development Co., Ltd. (Headquarters: Chiyoda-ku, Tokyo; President and CEO: Yasushi Ikeda) and Mitsubishi Jisho Residence Co., Ltd. (Headquarters: Chiyoda-ku, Tokyo; Representative Director, President and Executive Officer: Jiro Akira) announce the commencement of Phase 1 sales on Saturday, June 20, 2026, for 'Wellith Shin-Inokuchi,' a new condominium development with 126 units currently under construction in Inokuchi Meijin 1-chome, Nishi-ku, Hiroshima City, Hiroshima Prefecture.

Located just a 9-minute walk from the JR Sanyo Main Line 'Shin-Inokuchi' Station and an 8-minute walk from the Hiroden Miyajima Line 'Shoko Center Iriguchi' Station, the property offers access to two railway lines. It is also situated only 4 minutes on foot from the large commercial facility 'Alpark (West Building).' With a scenic cherry tree-lined promenade directly in front, 'Wellith Shin-Inokuchi' marks the first new condominium development in the Shin-Inokuchi area in approximately four years※1, bringing vitality, vibrancy, and richness to the neighborhood.

In addition to flexible 3-way access via JR, Hiroden, and bus networks, the project leverages the expansive site of over 4,600㎡—formerly an NTT employee housing compound—to achieve '100% on-site flat parking.' The development aims to become a new landmark where residents of all generations can live comfortably.

Exterior Completion CG※2

Features of 'Wellith Shin-Inokuchi'

(1) Comfort with Convenience: Proximity to Stations, Shopping, and Seasonal Natural Beauty

Despite being only 4 minutes on foot from the large commercial facility 'Alpark (West Building),' the 'Inokuchi Meijin 1-chome' area offers a calm and peaceful residential environment. The property is also conveniently located just 4 minutes from an elementary school and 6 minutes from a junior high school, and is close to a cherry tree-lined promenade and large parks, offering a healthy and enriching location.

Location Concept Diagram※3

(2) Mobility Through 3-Way Access via JR, Hiroden, and Bus

Residents can utilize two lines: the JR Sanyo Main Line 'Shin-Inokuchi' Station and the Hiroden 'Shoko Center Iriguchi' Station, enabling smooth access to central urban areas such as 'Hiroshima' Station. Additionally, from the 'Alpark' bus stop, just a 7-minute walk from the property, it takes 36 minutes by bus to reach the 'Kamiyacho' stop and 33 minutes to the 'Hondori' stop.

Transportation Access Concept Diagram

(3) Openness with a 63-Meter Southeast-Facing Expanse

Adjacent to the southeast-facing balconies is a promenade that beautifully changes with the seasons, allowing residents to experience the passage of time. The design achieves a sense of openness with an approximate 63-meter-wide frontage, including the adjacent road.

Location Concept Illustration※4 Balcony Completion CG※5

(4) Architectural Design Inspired by the Region's History and Culture of 'Moon' and 'Sea'

The building features a symmetrical and refined exterior design inspired by famous local landmarks such as 'Moon Viewing Spots' and the 'Meoto Iwa (Wedded Rocks).' Soft curves and glass elements that evoke the image of the moon and the ebb and flow of tides create a striking appearance. The same design is applied to the north side, ensuring a strong presence from any viewing angle.

Exterior Completion CG※6

(5) Comprehensive Planning for Comfort and Relaxation, Utilizing a Site Scale of Approximately 4,600㎡

Site Layout Illustration

The building is oriented to face southeast, maximizing openness for all units. On-site, 100% flat parking is provided for all units, with some spaces equipped for electric vehicles.

100% On-Site Flat Parking

❷ EV-Ready Parking Spaces

❸ 1 Visitor Parking Space

❹ Indoor Bicycle Parking

❺ Lounge

❻ 24-Hour Garbage Storage Area

❼ Disaster Preparedness Storage

❽ Parcel Delivery Boxes

Entrance Approach Completion CG※

❾ Entrance Approach with Covered Drop-Off Area

A hotel-style covered drop-off area is provided at the entrance, allowing smooth access into the building and convenient for loading and unloading luggage.

(6) An Elegant and Relaxing Entrance Lounge for Welcoming Guests

A bright and open lounge with a white color scheme is provided. The shared space is designed with the concept of the sea's generosity, featuring soft indirect lighting from a coffered ceiling and wall art inspired by rippling waves. This relaxing space can be used in various ways, such as meeting guests or reading.

Entrance Lounge Completion CG※7

Project Overview

Property Name

Wellith Shin-Inokuchi

Location

10-139 Inokuchi Meijin 1-chome, Nishi-ku, Hiroshima City, Hiroshima Prefecture (Lot Number)

Access

9-minute walk from JR Sanyo Main Line 'Shin-Inokuchi' Station

8-minute walk from Hiroden Miyajima Line 'Shoko Center Iriguchi' Station

Total Units

126 units

Structure and Floors

Reinforced Concrete, Partial Steel Frame, 18 Stories Above Ground

Design and Supervision

Architectural and Equipment Design: Asai Ken Architectural Research Institute Co., Ltd.

Structural Design: Okumura Corporation Nishinippon Branch Office, First-Class Architectural Office

Construction

Okumura Corporation

Building Area

885.45㎡ (Building Confirmation Application Area)

Total Floor Area

11,188.04㎡ (Building Confirmation Application Area)

Site Area

4,678.42㎡ (Building Confirmation Application Area),

4,678.86㎡ (Area for Sale)

Zoning

Secondary Residential Zone

Developer

NTT Urban Development Co., Ltd.

Developer and Sales Partner (Agent)

Mitsubishi Jisho Residence Co., Ltd.

Building Completion Date

January 2028 (Planned)

Occupancy Start Date (Handover Possible Month)

March 2028 (Planned)※After Completion of Procedures

On-Site Guide Map

Official Property Website

https://wellith.jp/shin-inokuchi126/

※1 This is the first new condominium supply near Shin-Inokuchi Station since September 2021 (according to Real Estate Economic Research Institute).

※2 The exterior completion CG is created based on planning-stage drawings, combined with a CG overlay of aerial photography (taken September 2025). Actual shape, color, landscaping, etc., may differ. Details of exterior wall features and equipment are not depicted. The texture and color appearance of tiles and materials may differ from actual products. Landscaping does not indicate a specific season. Plants will not have grown to the extent shown in the CG at the time of completion.

※3 This schematic diagram represents nearby convenience facilities and may omit certain roads and facilities. Compass directions may have slight inaccuracies. Information is current as of November 2025.

※4 The location concept illustration is a conceptual diagram excerpting selected facilities along a straight line from the site and does not guarantee views. Building position, height, distance, and scale may differ from reality, and the surrounding environment and views may change in the future.

※5 The balcony completion CG is a composite of a drawing based on the H-type planning stage and a photo taken from approximately the 5th floor on-site, processed with CG. Views from actual units may differ. Views and scenery vary by floor and unit and are not guaranteed due to potential future changes in the surrounding environment. Equipment such as gutters and outdoor AC units are not depicted. Furniture, lighting, and decorative items are not included in the sales price.

※6 The exterior completion CG is based on planning-stage drawings. Shape, color, landscaping, etc., may differ from reality. Details of exterior wall features and equipment are not depicted. The texture and color appearance of tiles and materials may differ. The landscaping in front of the building is not part of the property site but belongs to the adjacent Nishi Shuuyuu Green Space. Created based on a site survey as of April 2025, appearance and color may

FACT BOX

  • Source: PR TIMES
  • Category: New Product