Ecotec Tokyo Branch Aims for 5 Billion Yen in Standalone Sales

Ecotec Co., Ltd. announced the opening of its Tokyo branch in Ikebukuro on April 1, 2026, aiming for 5 billion yen in standalone sales in the metropolitan area. Leveraging its technology and construction expertise cultivated in Hokkaido, the company will fully deploy its metropolitan strategy, continuing its growth despite industry headwinds.
その他NQ 40/100出典:PR Times

📋 Article Processing Timeline

  • 📰 Published: April 1, 2026 at 18:00
  • 🔍 Collected: April 1, 2026 at 09:36
  • 🤖 AI Analyzed: April 22, 2026 at 04:57 (499h 20m after Collected)
Our company supports April Dream, which aims to make April 1st a day to express dreams.

This press release is the dream of "Ecotec Tokyo Branch Co., Ltd."

Ecotec Co., Ltd. (Higashi-ku, Sapporo, Hokkaido; Representative Director: Masaaki Kon) has built equipment infrastructure that supports people's lives with technology and sincere construction capabilities honed in Hokkaido. As a company responsible for the lifelines of buildings such as electricity, heating, ventilation, and air conditioning, it has accumulated a solid track record.

This press release is a declaration of determination, combining the fact of "Ecotec Tokyo Branch opening" with the serious dream of challenging for 5 billion yen in standalone sales in the metropolitan area.

On April 1, 2026, Ecotec opened its Tokyo branch in Ikebukuro, Toshima-ku, Tokyo.

The Kanto Sales Office (Kawaguchi City, Saitama Prefecture), which has been active as a base in the metropolitan area, will continue to exist as the "Tokyo Branch Saitama Office." It will evolve into a two-base system, strengthening all functions: sales, construction, and support.

This is not just a branch opening. It is an evolution to a new stage where the achievements and trust accumulated as the Kanto Sales Office have borne fruit, and the metropolitan area strategy will be fully deployed.

■ Power developed amidst headwinds

The construction industry is currently in the midst of a triple hardship: soaring prices, logistics stagnation, and labor shortages.

Nevertheless, we have continued to grow steadily for 10 consecutive periods, using the on-site capabilities and sincere response of each employee as our weapon.

We have expanded our challenge areas from a system centered on residential construction to non-residential fields such as public facilities, stores, and commercial buildings. We have continued to refine our construction quality and have become a "company of choice."

And now, we are expanding the stage of that challenge to the metropolitan area.

■ Our April Dream

To make the Tokyo branch—

・A leading electrical, HVAC, and construction partner in the metropolitan area

・An organization 10 times its current size

・A base with 5 billion yen in standalone sales within 10 years

This is not an ideal theory. It is a serious growth target based on a long-term strategy.

By establishing a base in Ikebukuro, the center of urban functions, we will strengthen our recruitment capabilities, enhance our proposal capabilities, and accelerate decision-making. We will evolve into an organization that combines speed and quality.

■ Becoming a "company we can't do without"

Quality. Responsiveness. Growth potential. And humanity.

What we aim for is not just expansion in scale.

For society, for our customers, and for our employees, we want to be a presence where "we can't do without Ecotec."

As a core company of the Cross-T Holdings Group, we will promote our metropolitan area strategy in cooperation with other group companies.

Leveraging the sincere construction capabilities cultivated in Hokkaido, we will challenge and grow in Tokyo, and eventually expand nationwide.

This dream is not a wish, but a declaration based on the premise of realization.

*This release supports PR TIMES "April Dream" and expresses a dream.