Xiaofengkou Parking Lot Closed for Qilai Mountain House Construction Material Lifting

The Xiaofengkou parking lot will be temporarily closed, and entry applications for routes like Qilai North Peak will be suspended from April 1st to 19th due to construction material lifting for the new Qilai Mountain House.
事件NQ 0/100出典:PR Times

📋 Article Processing Timeline

  • 📰 Published: April 10, 2026 at 15:53
  • 🔍 Collected: April 10, 2026 at 16:00 (7 min after Published)
  • 🤖 AI Analyzed: April 20, 2026 at 09:41 (233h 41m after Collected)
The National Park Administration (NPA) stated that due to the second phase of material lifting operations for the construction of the Qilai Mountain House, and considering the risk of falling materials during the lifting process, entry applications for the Qilai North Peak, Qilai East Ridge, Qilai Ridge, and Qilai Peaks routes will be suspended from April 1st to 19th. Additionally, to facilitate helicopter parking and material placement, the lower parking lot at Xiaofengkou will be closed from today until the 18th. The NPA stated that this is the final batch of material lifting, and the official opening time will be announced separately after assembly and subsequent inspection and trial operations. The Qilai Ridge Mountain House has been in use for over 30 years. Due to outdated facilities and limited capacity, the NPA plans to build a medium-sized mountain house about 50 meters north of the old one, equipped with facilities such as a drying room, kitchen, lounge, eco-toilet, and bear-proof cabinet, which can accommodate 38 people. (Editor: Xie Ya-zhu) 1150410