Joint Operational Training for Drainage Pump Vehicles
📋 Article Processing Timeline
- 📰 Published: May 12, 2026 at 19:09
- 🔍 Collected: May 12, 2026 at 10:31
- 🤖 AI Analyzed: May 15, 2026 at 08:40 (70h 8m after Collected)
Fujimino City and Kawagoe City will conduct joint operational training for their drainage pump vehicles on May 20, 2026. The training aims to prepare for potential flooding caused by heavy rains by ensuring swift and accurate deployment of drainage equipment. The vehicles used have a total weight of 8 tons and a drainage capacity of 30 tons per minute.